FidIG Purchase Instructions

To minimize the cost of a FidIG purchase, we lend you a FidIG to keep your instrument running while we modify the chimney that was on your system. Once we have upgraded your chimney, we send you the upgraded chimney(s) and you return the “loaners.”

To do this, we use the following shipping and handling procedure:

Chimney Swap

  • Contact AIC with the number of chimney’s you wish to upgrade.
  • AIC will ship you modified FidIG chimneys. Keep the shipping container and the return label provided to ship your chimney’s to AIC. Remove the AIC FidIG chimneys and set them aside.
  • Remove your ignitors (# 2 in the instructions sheet) from your currently running chimneys.
  • Remove your chimneys from your current GC. Place these chimney’s into the shipping box.
  • Install the AIC FidIG (temp) chimney into your GC and re-install the ignitors according to the instruction sheet.
  • Once all of the chimneys that are to be swapped are in the shipping container, seal up the shipping container provided by AIC and attach the return label to the outside.

When you have received your returned chimneys with modifications

  • Remove your FidIG modified chinmeys you have recieved from AIC and set them aside. Save the shipping container and the return label.
  • Remove the AIC temporary FidIG “loaner” chimneys from your instruments. Place the loaners into the shipping container provided.
  • Install your modified chimney’s in the instruments which were upgraded. Package the removed AIC FidIG’s and re-pack them in the shipping container.
  • When all of transferred chimney’s are back in the shipping container, seal up the shipping container provided and attach the return label to the outside.
  • When the whole process is done, we will charge your credit card for the modified chimneys and shipping.